AT A GLANCE
Data and facts about Costa Diadema
Stable ship data, last checked 24.07.2026.
- Year built
- 2014
- Length
- 306 m
- Passengers
- 4.947
- Crew
- 1.253
- Speed
- 23 kn
- Decks
- 14
- Tonnage
- 133.000 BRT
- Width
- 37 m
- Shipyard
- Fincantieri S.p.A.
- Flag
- Italien
- Onboard language
- Mehrsprachig
- Onboard currency
- Euro, US Dollar (Südamerika)
- Restaurants
- 7
- Pools
- 3
SHIP OVERVIEW
Discover Costa Diadema
Ship and design
The Costa Diadema was built at Fincantieri’s Marghera shipyard and unveiled by the shipyard and Costa Cruises on October 25, 2014. With a gross tonnage of 132,500, a length of more than 300 meters and a beam of 37 meters, it is one of the larger ships in the Costa fleet. Fincantieri lists 1,862 guest cabins. At the time, the ship was described as the fleet’s new flagship and its fifteenth vessel; this classification refers to the fleet as it stood in 2014.
For the public areas, the shipyard highlighted spacious rooms, some extending across several decks, that faced directly out to sea and connected with one another. The design was intended to evoke the atmosphere of a lively Italian seaside resort. One striking example is the outdoor promenade on deck five, which is more than 500 meters long. It runs alongside various bars and restaurants and gives guests unobstructed views of the sea. The promenade combines fresh-air exercise with the ship’s dining venues and is a distinctive feature of its layout.
The construction was also part of a long-standing partnership; the background on specialist cruise shipyards provides the industrial context: Fincantieri described the Diadema as the twelfth cruise ship the shipyard had built for Costa in Italy. The shipyard put the project’s investment at around 550 million euros. According to its statement at the time, about 1,000 shipyard employees, 2,500 subcontractor staff and around 400 suppliers were involved in completing the vessel in Marghera.
Handover and first Mediterranean voyages
After handover, the Costa Diadema was scheduled to depart Venice on October 30, 2014, and then reach Trieste. From there, the so-called Vernissage cruise was planned to depart on November 1, sailing via Dubrovnik, Corfu, Malta and Naples to Genoa, where the ship was expected to be christened on November 7. Three initial seven-day cruises were announced from November 8. From November 8, 2014, until the end of the 2015 summer season, weekly seven-day cruises were scheduled to depart from Savona and sail through the western Mediterranean, calling at Marseille, Barcelona, Palma de Mallorca, Naples and La Spezia.
ON BOARD
At a glance for your cruise